HRC has assisted
the City of Farmington Hills with administration and implementation
of its Soil Erosion and Sedimentation Control Program since
1996. HRC field staff conducted site observations at
residential and commercial construction sites to ensure that
adequate soil erosion controls are installed and maintained
in accordance with the city-issued soil erosion permit.
When controls are not adequately installed or maintained,
HRC initiates enforcement action against the property owner
on behalf of the City. HRC maintains records of all
site observations, enforcement actions and contacts.
HRC field staff have completed MDEQ Phase 1 and Phase 2 training
and have been certified as NPDES Stormwater Operators.