HYDRAULIC/HYDROLOGICAL MODELING // Minnow Pond Drain Flood Relief Project Phase III
  • Modeled using Illudrain and HEC-2 based on Farmington Hills Master Plan for Future Land Use.

  • Channel banks and portions of entire channel were stabilized with a combination of geotextile fabric overlaid with natural boulders or rock fragment to prevent channel scour.

  • Channel improvements included excavation to depths approaching 5' at impoundment locations to allow sediment deposition and to discourage sediment transport to downstream areas.

  • A low head dam with overflow weir was constructed to maintain desired water depths.  Dam includes valve to allow lowering of impoundment for future maintenance or sediment removal.

  • Dam overflow weir and rock channel lining assist in aerating stream flows for water quality enhancement.

  • Utilization of excavated sumps within several locations of the drain channel combined with bypass pumping of drain flows allowed excavation and cleanout of the existing channel to occur without producing excessive sediment transport to downstream areas.

Client
City of Farmington Hills

Location
Farmington Hills, MI

Awards
Water Quality Award - Michigan Association of County Drain Commissioners