Reconstruction of
2.8 km of Long Lake Road (Carnaby to Dequindre Road)
for two lanes to five lanes. The project includes
relocating approximately 2 km of 300 mm and 400 mm water
main, extension of a large capacity master storm sewer and
the replacement of a 30 m long x 10 m wide County drain
crossing. In compliance with the City's Master sidewalk
plan, a sidewalk and a safety path were constructed the
entire length of the project.
HRC responsibilities included:
- Topographic Survey
- Preparation of Legal Documents
- MDEQ Permit Application
- Hydraulic Study
- Scour Analysis
- Construction Plans and Specifications
- Construction Staging and Traffic Control
- Pavement Markings
- Utility Coordination
- Structure Design
- Construction Administration, Inspection, Layout and Testing
The project was funded through MDOT and FHWA.
Construction Engineering and Testing
Construction included storm drain work in adjacent
City of Sterling Heights, a crossing of an existing DWSD
Transmission Watermain and the installation of a new box
culvert crossing.