The project included
5.6 miles of concrete freeway construction and widening.
Bridge work included the removal of two 3-span river bridges
to the footings, the widening of these structures and reconstruction.
Three 4-span bridges had steel repair, straightening of
beams and painting.
HRC
responsibilities included:
- Construction Management
- Construction Inspection
- Testing
- Construction Documentation
- Field Manager Record Keeping
- Dispute Resolution
- Design Changes