STRUCTURAL ENGINEERING // I-75 Reconstruction, I-475 to M-57/Bridge Work

The project included 5.6 miles of concrete freeway construction and widening.  Bridge work included the removal of two 3-span river bridges to the footings, the widening of these structures and reconstruction.  Three 4-span bridges had steel repair, straightening of beams and painting.

HRC responsibilities included:

  • Construction Management
  • Construction Inspection
  • Testing
  • Construction Documentation
  • Field Manager Record Keeping
  • Dispute Resolution
  • Design Changes

Client
Michigan Department of Transportation

Location
Genesee County, MI

Awards
2004 Award of Excellence
Michigan Concrete Paving Association