ABOUT HRC SERVICES PRESS ROOM CAREERS CONTACT US
Riverland Bridge Rehabilitation 1994 Bridge Maintenance Program Riverland Bridge Rehabilitation 1994 Bridge Maintenance Program

STRUCTURAL ENGINEERING // Riverland Bridge Rehabilitation

The project consisted of superstructure removal and replacement with a 105', 2 span bridge and rehabilitation of existing substructure, Van Dyke north of 19 Mile Road. HRC conducted site inspections and evaluations and prepared project plans and specifications; performed construction engineering, construction layout, construction observation and contract administration.

HRC responsibilities included:

  • Road Design
  • Bridge Design
  • Topographic Survey
  • ROW/Easement
  • DEQ Permit Application
  • Hydraulic Study
  • Pavement Markings
  • Utility Coordination
  • Lighting
  • Cost Estimate
  • Construction Administration
  • Construction Testing

 


Client
City of Sterling Heights

Location
Sterling Heights, MI

Services



Project Portfolio


HOME CONTACT US LOCATIONS SEARCH