Right-of-Way Acqusition // Sashabaw Road Reconstruction Right-of-Way Acquisition // Sashabaw Road Reconstruction
RIGHT-OF-WAY ACQUISITION // Sashabaw Road Reconstruction (Maybee to Waldon)

HRC provided Right-of-Way Acquisition services for the reconstruction of 1.9 km of Sashabaw Road from two lanes to a 4-lane boulevard.  The project included approximately 2 km of new 400 mm watermain, and coordinating storm design with Independence Township's regional detention design.  (Regional system was also designed by HRC.)  In compliance with the Township's Master Safety Path plan, safety paths were constructed the entire length of the project.  Coordinated the design with private utility relocation that included major new facilities for growing regional area.

HRC responsibilities included:

  • Right-of-Way Acquisition
  • Topographic Survey
  • DEQ Permit Application
  • Watermain Design
  • Construction Plans and Specifications
  • Maintaining Traffic Plans
  • Pavement Markings
  • Preparation of Legal Documents
  • Utility Coordination

The project was funded through MDOT and FHWA.


Client
Road Commission for Oakland County

Location
Independence Township, MI